BUILDING OUR NEXT CHAPTER

More capability.
The same clear purpose.

We are working toward full Tennessee Building Construction (BC) contractor licensure to connect development strategy with a broader range of building work.

STATE EXAM PASSED

Final licensing steps in progress.

Our team has passed the state exam and is completing the remaining licensing requirements. Full BC licensure has not yet been issued.

Passing an exam is a milestone; the Board’s issued license determines the authorized classification and monetary limit.

WHAT WE ARE WORKING TOWARD

Residential. Commercial. Industrial.

Once issued, a full BC license would allow us to contract for those building projects within our approved scope and monetary limit. It would create a more connected path from property strategy and planning to building delivery.

Today, construction work requiring licensure is handled by appropriately licensed contractors. Architects, engineers and surveyors remain responsible for their own professional disciplines.

KNOW THE DIFFERENCE

One building family. Different scopes.

BC

Full building construction

Residential, commercial and industrial building construction.

BC-A

Residential

One- through four-family residences up to three stories, plus accessory structures.

BC-B

Commercial

Buildings for public use and occupancy, including residential buildings with more than four units or more than three stories.

BC-C

Industrial

Buildings used for industrial production or service, such as manufacturing facilities.

“Full BC” describes breadth of building classifications. It does not mean an unlimited dollar limit. Each license is issued with a monetary limit. Tennessee classification outline ↗

THE WORK BEHIND A BUILDING

Explore all 34 building categories.

These are Tennessee’s building subcategories, explained in everyday language. They are an educational guide, not a list of services we currently offer.

Showing 34 of 34 categories

BC-1

Acoustical treatments

Sound absorption and noise control.

BC-2

Carpentry, framing and millwork

Structural framing, woodwork and trim.

BC-3

Drywall

Interior wall and ceiling board systems.

BC-4

Floor covering

Finished floor materials and installation.

BC-5

Foundations

Building support below the structure.

BC-6

Glass, windows and doors

Glazing and building openings.

BC-7

Institutional and recreational equipment

Specialized equipment for shared-use facilities.

BC-8

Lath, plaster, stucco and aluminum siding

Wall finishes and exterior cladding.

BC-9

Masonry under $100,000

Brick, block and stone within this category’s limit; larger masonry work has separate licensing requirements.

BC-10

Ornamental and miscellaneous metal

Railings and architectural metal features.

BC-11

Painting and interior decorating

Coatings and decorative interior finishes.

BC-12

Roof decks

The supporting deck beneath roofing.

BC-13

Site and subdivision development

Preparing and organizing development sites.

BC-14

Special coatings and waterproofing

Surface protection and moisture resistance.

BC-15

Tile, terrazzo and marble

Hard-surface floors and finishes.

BC-16

Insulation

Thermal and related building insulation.

BC-17

Elevators, escalators and dumbwaiters

Vertical transportation systems; additional registration requirements apply.

BC-18

Structural steel erection and fabrication

Making and assembling steel structures.

BC-19

Concrete

Concrete placement and construction.

BC-20

Sheet metal

Formed sheet-metal building components.

BC-21

Roofing, gutters and vinyl siding

Roof coverings and related exterior work.

BC-22

Conveyors

Material-moving conveyor systems.

BC-23

Sandblasting

Abrasive cleaning and surface preparation.

BC-24

Golf courses

Golf-course construction.

BC-25

Tennis courts

Tennis-court construction.

BC-26

Swimming pools

Swimming-pool construction.

BC-27

Outdoor advertising

Outdoor advertising structures.

BC-28

Excavation

Digging and earth removal.

BC-29

Landscaping

Landscape installation and improvements.

BC-30

Fencing

Fences and enclosure systems.

BC-31

Demolition

Removal of buildings and structures.

BC-32

Millwright

Installation and alignment of industrial machinery.

BC-33

Irrigation

Landscape irrigation systems.

BC-34

Scaffolding

Temporary access and working platforms.

Where other licenses come in

BC does not replace separate electrical (CE), mechanical and plumbing (CMC), architectural, engineering or surveying credentials. Specialty work, including larger masonry projects, can require additional licensing. Work must follow the issued license, applicable permits and professional requirements.

Sources reviewed October 28, 2026: classification outline · licensing process · verify a Tennessee license. Our exam milestone is a company-reported update.

FOLLOW WHAT’S NEXT

Grow with us.

Join for licensing updates, development insights and industry connections.

Join the free network ↗