NASHVILLE AIRPORT DEVELOPMENT

Growth beyond
the gates.

A connected city starts with better connections.

Your guide to BNA’s expansion, the land around it, and the decisions that come next. Follow the projects. Read the plans. Ask better property questions.

Source review · October 28, 2026

THE DEVELOPMENT BOARD

What’s open.
What’s next.

BNA Vision concluded in February 2024. New Horizon is the next construction program. The Master Plan looks farther ahead, beyond those committed works. Start with BNA’s overview ↗

8 projects · Status reviewed October 28, 2026

Underway

Rental cars & public parking

New rental facility and garage; construction began in FY2026.

Long-range

Airport Master Plan update

Study framework; individual projects need further review and funding.

Planning through 2047Official project source ↗

Targets are the airport’s published estimates, not guaranteed opening dates. The rental facility’s 2029 target is detailed in BNA’s landside program ↗. Open the source for later changes.

READ THE LAYERS

One airport.
Different plans.

A construction schedule, an airport layout, a noise contour, and local zoning answer different questions. Use them together.

01 / LONG-RANGE

The Master Plan

A framework through 2047, with the update process expected to finish in the first half of 2027. Recommendations still need project-specific environmental review and funding.

Read the study and community materials before treating an idea as an approved project.

Master Plan & FAQs ↗
02 / NOISE & AIRPORT LAND

Maps with context

Find airport layout plans, environmental documents and noise exposure maps. Noise contours describe modeled sound exposure; they do not show flight paths.

Check each map’s date. The posted 2020 study includes a future-2025 scenario; a separate noise-map update is underway.

Airport plans & noise maps ↗

FOR LANDOWNERS, REALTORS & BUILDERS

Near the airport?
Start with the parcel.

Proximity is a starting point for research. Whether a hotel, home, warehouse, or another use makes sense depends on the actual site, public approvals, access, and market demand.

This is a research guide. Airport growth does not establish a parcel’s permitted use or guarantee its value.

Open parcel finder ↗
  1. Identify the land

    Confirm the parcel, ownership, recorded easements, and public-road access.

    Search county records ↗
  2. Read local policy and zoning

    Check the community plan and zoning for the actual parcel. Donelson–Hermitage–Old Hickory is one nearby planning area, not the entire airport area.

    Read the community plan ↗
  3. Check noise and airspace

    Review noise maps and applicable airport overlays. Buildings and construction cranes may also trigger separate FAA notice and airspace review using Form 7460-1.

    Check FAA notice criteria ↗
  4. Test the site and access

    Have your team investigate utilities, stormwater, flood conditions, soils, driveway access, and road changes.

    Open the development resources ↗
  5. Confirm the approval path

    Bring the concept to the relevant agencies and qualified professionals. A master plan does not replace local permits.

    Search permits & status ↗

BE PART OF WHAT COMES NEXT

Follow the decisions.
Find your opening.

Public information for neighbors. Official opportunities for firms. Start with the right channel.

MORE THAN ONE AIRPORT

Meet JWN.

John C. Tune is Nashville’s general-aviation reliever airport, west of downtown. It plays a different role from BNA’s commercial passenger gateway.

John C. Tune Airport & plans ↗

PUT YOUR QUESTION ON THE MAP

Have land. Have an idea.
Let’s find your next step.

Join the free Smart Girl network, or request a focused property conversation with Jessica.